REINA GROUP, CAMBER SANDS

We drilled and installed 4 boreholes for ground source heat pumps at this site. This was an interesting job as the only access to the site […]
September 6, 2017

HORSHAM, WEST SUSSEX

Nicholls boreholes drilled and installed 6 boreholes and headerworks and installed a twin 10kw Stebel Eltron heat pump, which overcame the problem of needing to have […]
September 6, 2017

CHICHESTER, WEST SUSSEX

Nicholls Boreholes drilled and installed 2 boreholes at 110 metres and a Stiebel ground source heat pump for this eco house and also the underfloor heating […]
September 6, 2017

MIDHURST, WEST SUSSEX

System one installed in 2008 consisting of a 12kW nibe heat pump with 3 boreholes. System two installed in 2010 consisting of 7 boreholes and header […]
September 6, 2017
Boreholes for GSHP

BOREHOLE AND GSHP

At this property we supplied and installed a ground source heat pump system with boreholes and underfloor heating, along with a water borehole and pumping equipment. […]
August 25, 2017

COMMERCIAL GROUND SOURCE HEAT PUMP PROJECT FOR EXCLUSIVE PROPERTY GROUP

Nicholls Boreholes were selected by Synergy Property Group – a fully integrated property company based in Stevenage to work with one of their clients, Ion Science […]