REINA GROUP, CAMBER SANDS

HORSHAM, WEST SUSSEX
September 6, 2017
WIVESFIELD, EAST SUSSEX
September 6, 2017

We drilled and installed 4 boreholes for ground source heat pumps at this site. This was an interesting job as the only access to the site was along the beach at camber sands, we had to set up the drilling rig on the beach and drilled the boreholes on the beach through the sand. The boreholes were drilled for 2 ground source heat pumps to heat 2 beach houses.