At a glance
- 19kW GSHP system
- 4 x 110 metre boreholes
- Removal of the old oil heating system
- BUS funding grant
- Ongoing support from the dedicated Nicholls Service and Maintenance Department.
Objective
Our client wanted to move away from their existing oil heating system and be more sustainable.
About the project
As part of some remedial works to a converted flint barn we installed 4 x 110 GSHP boreholes underneath the footprint of the new extension. This allowed minimal disruption to the well kept gardens.
Our Nicholls’ design team had calculated the requirement for a 19kW Vaillant heat pump and as Nicholls are a Vaillant approved installer, the client benefits from a 7 year parts warranty.
The whole system runs from a solar array, keeping the carbon footprint of the property to a minimum.
“Nicholls Boreholes were extremely professional from the outset and managed all the typical site constraints and complications well. The service has been amazing.”
Client